Civil Construction & Building Quotation Template

A realistic civil engineering and residential building quotation template formulated according to CIDA / ICTAD standards in Sri Lanka. Ideal for building contractors, civil engineers, and renovation specialists handling structural work, masonry, and finishes.

Use This Construction & Civil Template Free • No signup • Instant A4 PDF

Sample Construction & Civil Line Items

Pre-loaded into the generator with realistic market pricing (LKR)

Customize in Generator →
Description Qty & Unit Est. Price (LKR) Line Total
Site Clearing, Leveling, Excavation & Setting Out
Clearing vegetation, soil removal up to 1.5m depth for column footings, layout surveying, and compaction.
1 job Rs. 185,000.00 Rs. 185,000.00
Grade 25 Ready-Mix Concrete for Substructure Footings & Tie Beams
Supply and placement of Holcim/Tokyo Super cement G25 concrete including mechanical vibrator compaction and formwork.
35 sq.ft Rs. 38,500.00 Rs. 1,347,500.00
Tor Steel Reinforcement (High-Yield RB500)
Fabrication, cutting, bending and tying 10mm, 12mm & 16mm RB500 Lanwa/Melwire steel bars including binding wire.
2800 kg Rs. 395.00 Rs. 1,106,000.00
9-inch Solid Brick / Engineering Block Masonry Walls
Clay wire-cut bricks in 1:5 cement sand mortar, horizontal wire reinforcement at every 4 courses, damp-proof course (DPC).
1850 sq.ft Rs. 450.00 Rs. 832,500.00
Internal & External Smooth Sponge Finish Cement Plastering
16mm thick 1:4 cement sand rendering to masonry surfaces, true to plumb line and cured with water for 7 days.
3200 sq.ft Rs. 280.00 Rs. 896,000.00
Scaffolding, Formwork Shuttering & Machinery Hire
Marine plywood shuttering, steel props, concrete mixer hire, hoist, transport and safety barriers.
1 lot Rs. 220,000.00 Rs. 200,000.00
Sample Subtotal: Rs. 4,567,000.00

Default Commercial Terms

  • Water and three-phase construction electricity supply at site to be facilitated by client.
  • Rates are based on current market prices for cement (50kg bag) and steel (per kg); material price escalations beyond ±5% will be adjusted based on official ICTAD/CIDA bulletins.
  • Variations, additions, or soil condition alterations will be billed separately upon mutual written consent.
  • 5% retention money will be withheld for 6 months after practical completion (Defects Liability Period).

Warranty & Payment Milestones

Warranty Coverage:
10-Year structural guarantee on concrete foundations, columns, and slabs. 6 Months Defects Liability Period (DLP) covering minor settling cracks and plaster touch-ups.
Payment Schedule:
25% Mobilization advance upon contract execution, 65% Stage payments based on bi-weekly joint site measurements, 5% upon Practical Handover, 5% Retention released after 6 months.
Timeline:
Estimated project duration: 120 calendar days from receipt of mobilization advance and municipal building approval.

Ready to create this quotation?

Load these items into our generator, customize your business info, logo, customer details, and download a professional A4 PDF.

Use This Construction & Civil Template Now

Frequently Asked Questions

How detailed should a Sri Lankan construction quotation be?

It should clearly distinguish mobilization, materials (cement, steel, blocks), skilled and unskilled labour, shuttering/scaffolding, payment milestones, and the retention percentage according to CIDA guidelines.

How are material price increases handled in quotations?

Experienced builders include an escalation clause tied to official CIDA indices. Our template provides a pre-written term allowing price adjustments if raw materials fluctuate significantly.

Can I use this for renovations or interior partition work?

Yes, you can edit or remove items to customize it for house additions, tiling, roofing, or light-gauge steel renovations.